6A 09-15 (1 Min) 8.31.2015

 Building Approvals  Comments Off on 6A 09-15 (1 Min) 8.31.2015
Sep 052015
 

6A 09-15 (1 Min) 8_31_2015

8/31/2015 Building Approvals (2130 EDT)
Forecast: 2.9%
Actual: 4.2%
Previous Revision: +3.0% to -5.2%
INDECISIVE…SPIKE WITH 2ND PEAK
Started @ 0.7125
Head Fake to 0.7130 – 2130:05 (1 min)
5 ticks

1st Peak @ 0.7114 – 2130:44 (1 min)
11 ticks

2nd Peak @ 0.7106 – 2140 (10 min)
19 ticks

Reversal to 0.7121 – 2158 (28 min)
15 ticks

Notes: Report mildly exceeded the forecast along with a large upward previous revision. This was dual booked with a quarterly current account report that disappointed the market. Hence on the conflicting news, we got a head fake long spike of 5 ticks followed by the true short move of 11 ticks in 44 sec. With JOBB, your long order would have filled at 0.7129 with 1 tick of slippage then it would have backed off to hover about 4 ticks in the red. Move the stop up a few ticks and look to exit with a handful of ticks loss. It fell slowly to cross the R1 Mid Pivot. Then it stalled for a few min before falling another 8 ticks to cross the 100/200 SMAs and reach the PP Pivot. Then it reversed 15 ticks in 18 min to the R1 Mid Pivot. After that it fell again, but it was likely due to other factors.

6A 09-15 (1 Min) 7.29.2015

 Building Approvals  Comments Off on 6A 09-15 (1 Min) 7.29.2015
Sep 052015
 

6A 09-15 (1 Min) 7_29_2015

7/29/2015 Building Approvals (2130 EDT)
Forecast: -0.8%
Actual: -8.2%
Previous Revision: -0.1% to 2.3%
SPIKE / REVERSE
Started @ 0.7297
1st Peak @ 0.7282 – 2130:22 (1 min)
15 ticks

Reversal to 0.7305 – 2158 (28 min)
23 ticks

Notes: Report fell well short of the forecast along with a negligible downward previous revision that resulted in short spike of 15 ticks that crossed all 3 major SMAs. With JOBB, your short order would have filled at 0.7293 with 1 tick of slippage then allowed up to about 10 ticks to be captured after 22 sec. Then it reversed 23 ticks in 27 min to the HOD.

6A 09-15 (1 Min) 6.30.2015

 Building Approvals  Comments Off on 6A 09-15 (1 Min) 6.30.2015
Jul 262015
 

6A 09-15 (1 Min)  6_30_2015

6/30/2015 Building Approvals (2130 EDT)
Forecast: 1.2%
Actual: 2.4%
Previous Revision: -0.8% to -5.2%
SPIKE / REVERSE
Started @ 0.7683
1st Peak @ 0.7692 – 2130:18 (1 min)
9 ticks

Reversal to 0.7686 – 2133:14 (4 min)
6 ticks

Notes: Report moderately exceeded the forecast but was offset with a moderate downward previous revision that resulted in long spike of 9 ticks to the HOD. It did have a short corrective move prior to the report which may have been a tripwire to cancel the order but it would have been safe. With JOBB, your long order would have filled at 0.7686 with no slippage then allowed about 5 ticks to be captured after 18 sec. Then it reversed 6 ticks in 3 min to the 20 SMA. After that it traded sideways as it headed into the CNY final manufacturing report.

6A 06-15 (1 Min) 5.31.2015

 Building Approvals  Comments Off on 6A 06-15 (1 Min) 5.31.2015
Jun 092015
 

6A 06-15 (1 Min)  5_31_2015

5/31/2015 Building Approvals (2130 EDT)
Forecast: -1.7%
Actual: -4.4%
Previous Revision: +0.1% to 2.8%
INDECISIVE – TRIPWIRE TO CANCEL
Started @ 0.7635
1st Peak @ 0.7642 – 2130:01 (1 min)
7 ticks

Reversal to 0.7624 – 2130:05 (1 min)
18 ticks

Pullback to 0.7636 – 2130:13 (1 min)
12 ticks

Notes: Report moderately fell short of the forecast along with a negligible upward previous revision that resulted in a whipsaw with a warning to cancel as the market dove 8 ticks and recovered 15 sec before the release. So disable the strategy and avoid the foreshadowed chaos. After the release, it climbed 7 ticks before reversing 18 ticks and eventually pulling back 12 ticks to the origin area on the S1 Mid Pivot / 200 SMA. Then it chopped sideways without any conviction.

6A 06-15 (1 Min) 5.3.2015

 Building Approvals  Comments Off on 6A 06-15 (1 Min) 5.3.2015
May 062015
 

6A 06-15 (1 Min)  5_3_2015

5/3/2015 Building Approvals (2130 EDT)
Forecast: -1.7%
Actual: 2.8%
Previous Revision: +1.6% to -1.6%
SPIKE/REVERSE
Started @ 0.7811
1st Peak @ 0.7820 – 2130:03 (1 min)
9 ticks

Reversal to 0.7811 – 2132 (2 min)
9 ticks

Notes: Report moderately exceeded the forecast along with a healthy upward previous revision to cause a 9 tick long spike in 3 sec that crossed the OOD and PP Pivot. With JOBB and a 3 tick bracket, your long order would have filled at 0.7815 with 1 tick of slippage, then backed off before pulling back later in the :31 bar. This would have allowed 1-3 ticks to be captured. After that it reversed 9 ticks to the origin in 1 min then traded sideways before the Chinese HSBC report at 2145.

6A 06-15 (1 Min) 3.31.2015

 Building Approvals  Comments Off on 6A 06-15 (1 Min) 3.31.2015
Apr 112015
 

6A 06-15 (1 Min)  3_31_2015

3/31/2015 Building Approvals (2030 EDT)
Forecast: -3.8%
Actual: -3.2%
Previous Revision: -2.0% to 5.9%
INDECISIVE
Started @ 0.7597
Head Fake @ 0.7594 – 2030:04 (1 min)
3 ticks

1st Peak @ 0.7605 – 2030:16 (1 min)
8 ticks

Reversal to 0.7595 – 2032 (2 min)
10 ticks

Double Top @ 0.7604 – 2037 (7 min)
9 ticks

Reversal to 0.7592 – 2046 (16 min)
12 ticks

Notes: Report mildly exceeded the forecast but was offset by a healthy downward previous revision to cause a 3 tick short head fake in 4 sec to the 13 SMA followed by an 8 tick long spike 12 sec later to nearly reach the R1 Pivot. With JOBB and a 3 tick bracket, your short order would have filled at 0.7597 with no slippage, then backed off and stalled on the R1 Mid Pivot for 4 sec. Then it slowly marched toward the stop and would have hit the stop at 12 sec after the fill with no previous intervention. Recognize the offsetting results combined with the market behavior and get out with 2-4 ticks loss as opposed to 8 ticks. After the peak, it reversed 10 ticks in 1 min to the R1 Mid Pivot / 13 SMA before climbing for a double top in 5 min. Then it reversed 12 ticks to the 50 SMA in 9 min.

6A 03-15 (1 Min) 3.2.2015

 Building Approvals  Comments Off on 6A 03-15 (1 Min) 3.2.2015
Mar 222015
 

6A 03-15 (1 Min)  3_2_2015

3/2/2015 Building Approvals (1930 EST)
Forecast: -1.8%
Actual: 7.9%
Previous Revision: +0.5% to -2.8%
SPIKE / REVERSE
Started @ 0.7748
1st Peak @ 0.7763 – 1930:02 (1 min)
15 ticks

Reversal to 0.7750 – 1933 (3 min)
13 ticks

Double Top @ 0.7763 – 2002 (32 min)
13 ticks

Reversal to 0.7751 – 2030 (60 min)
12 ticks

Notes: Report strongly exceeded the forecast to cause a long spike of 15 ticks that started just below the S2 Mid Pivot and rose to cross the 200 SMA and S1 Mid Pivot and extend the HOD. It gained 15 ticks then retreated 12 ticks immediately due to crossing the 200 SMA, then rebounded to hover in between the 200 SMA and S1 Mid Pivot. With JOBB and a 3 tick bracket, your long order would have filled at about 0.7752 with 1 tick of slippage, then allowed about 8 ticks to be captured where it hovered. Then it reversed 13 ticks in the next 2 min to the 50 SMA. After that it climbed for a double top in 29 min before reversing 12 ticks in 28 min.

6A 03-15 (1 Min) 2.2.2015

 Building Approvals, Monthly Trade Balance  Comments Off on 6A 03-15 (1 Min) 2.2.2015
Mar 032015
 

6A 03-15 (1 Min)  2_2_2015

2/2/2015 Monthly Trade Balance / BLDG Approvals (1930 EST)
Forecast: -0.85B
Actual: -0.44B
Previous Revision: -0.09B to -1.02B
Forecast: -4.8%
Actual: -3.3%
Previous Revision: +0.2% to 7.7%
TRAP TRADE – DULL NO FILL
Anchor Point @ 0.7776
————
Trap Trade:
)))1st Peak @ 0.7766 – 1930:05 (1 min)
)))-10 ticks

)))Reversal to 0.7784 – 1930:50 (1 min)
)))18 ticks
————
Continued Reversal to 0.7787 – 1939 (9 min)
21 ticks

Trap Trade Bracket setup (1 tier – 15/20 ticks):
Long entry – 0.7761 (just below the S1 Pivot)
Short entry – 0.7796 (just below the R1 Mid Pivot)

Notes: The Trade Balance report exceeded the forecast by 0.41B with a small downwad previous report revision while the BLDG Approvals report also exceeded the forecast by 1.5% with a negligible upward previous revision. All of this caused a whipsaw that was just too small by a few ticks to fill the inner long entry as it fell 10 ticks to fall short of the S1 Pivot then reversed for 18 ticks to reach the 200 SMA. Cancel the order as it was fleeting and fell short of the tier. After the :31 bar, it climbed 3 more ticks in the next 8 min to reach the PP Pivot and HOD.

6A 03-15 (1 Min) 1.7.2015

 Building Approvals  Comments Off on 6A 03-15 (1 Min) 1.7.2015
Jan 192015
 

6A 03-15 (1 Min)  1_7_2015

1/7/2015 Building Approvals (1930 EST)
Forecast: -2.7%
Actual: 7.5%
Previous Revision: +0.1% to 11.5%
SPIKE / REVERSE
Started @ 0.8048
1st Peak @ 0.8066 – 1931:18 (2 min)
18 ticks

Reversal to 0.8060 – 1933 (3 min)
6 ticks

2nd Peak @ 0.8068 – 1938 (8 min)
20 ticks

Reversal to 0.8051 – 2000 (30 min)
17 ticks

Double Top @ 0.8068 – 2007 (37 min)
17 ticks

Reversal to 0.8054 – 2033 (63 min)
14 ticks

Notes: Report strongly exceeded the forecast to cause a long spike of 18 ticks that started on the R1 Mid Pivot and rose to cross the R1 Pivot and extend the HOD. It gained 15 ticks in 7 sec, then struggled for the remaining 3 ticks in the next minute. With JOBB and a 3 tick bracket, your long order would have filled at about 0.8055 with 4 ticks of slippage, then allowed about 6 ticks to be captured on a conservative quick exit or about 10 ticks with a target placed just above the R1 Pivot. After a small 6 tick reversal, it climbed for a minor 2nd peak of 2 more ticks in 6 min. After treading water around the R1 Pivot, it reversed 17 ticks in 22 min as it crossed the 50 SMA. Then it climbed for a double top in 7 min followed by reversal of 14 ticks to the 100 SMA.

6A 12-14 (1 Min) 12.1.2014

 Building Approvals  Comments Off on 6A 12-14 (1 Min) 12.1.2014
Jan 042015
 

6A 12-14 (1 Min)  12_1_2014

12/1/2014 Building Approvals (1930 EST)
Forecast: 5.2%
Actual: 11.4%
Previous Revision: -0.2% to -11.2%
SPIKE / REVERSE
Started @ 0.8481
1st Peak @ 0.8496 – 1930:02 (1 min)
15 ticks

Reversal to 0.8481 – 1936 (6 min)
15 ticks

Continued reversal to 0.8472 – 1945 (15 min)
24 ticks

Notes: Report came in at the highest level in over a year to cause a long spike of 15 ticks that started on the 100 SMA and rose to cross the 200 SMA / S1 Mid Pivot and extend the HOD in 2 sec. It backed off about 10 ticks, then rebounded quickly to hover around the HOD position. With JOBB and a 3 tick bracket, your long order would have filled at about 0.8488 with 4 ticks of slippage, then allowed about 5 ticks to be captured when it hovered for over 30 sec. After that it reversed 15 ticks in 5 min to the 100 SMA, then another 9 ticks in the next 9 min as it crossed the S1 Pivot.