CL 09 12 (1 Min) 07.17.12

 Industrial Production  Comments Off on CL 09 12 (1 Min) 07.17.12
Jul 172012
 


CL 09 12 (1 Min) 07.17.12

7/17/2012 Monthly Industrial Production (0315 HI time / 0915 EDT)
Forecast: 0.4%
Actual: 0.4%
Previous revision: -0.1% to -0.2%
DULL REACTION
Started @ 89.45
1st Peak @ 89.36 – 0317 (2 min)
9 ticks

Reverse to 89.54 – 0326 (11 min)
18 ticks

Notes: Report matched the forecast, and the previous report was revised slightly downward. This caused a dull reaction and with no impetus to react from the report. Close out JOBB after 10 seconds with no fill or decisive move.

CL 08 12 (1 Min) 06.15.12

 Industrial Production  Comments Off on CL 08 12 (1 Min) 06.15.12
Jun 152012
 


CL 08 12 (1 Min) 06.15.12

6/15/2012 Monthly Industrial Production (0315 HI time / 0915 EDT)
Forecast: 0.1%
Actual: -0.1%
Previous revision: -0.1% to 1.0%
DULL REACTION
Started @ 83.76
1st Peak @ 83.80 – 0316 (1 min)
4 ticks

Reverse to 83.71 – 0317 (2 min)
9 ticks

Notes: Report mildly fell short of the forecast, and the previous report was revised slightly downward. This caused a dull reaction and with no impetus to react from the report. Close out JOBB after 10 seconds with no fill or decisive move.

CL 08 12 (1 Min) 05.16.12

 Industrial Production  Comments Off on CL 08 12 (1 Min) 05.16.12
May 162012
 


CL 08 12 (1 Min) 05.16.12

Caption for 5.16:
5/16/2012 Monthly Industrial Production (0315 HI time / 0915 EDT)
Forecast: 0.6%
Actual: 1.1%
Previous revision: -0.6% to -0.6%
DULL REACTION
Started @ 93.33
1st Peak @ 93.38 – 0316 (1 min)
5 ticks

Reverse to 93.26 – 0317 (2 min)
12 ticks

Notes: Report exceeded the forecast, but the previous report was largely revised downward. This caused a dull reaction and no more than 5 ticks move long and short from the origin initially. Close out JOBB after 10 seconds with no fill or decisive move.

CL 05 12 (1 Min) 04.17.12

 Industrial Production  Comments Off on CL 05 12 (1 Min) 04.17.12
Apr 172012
 


CL 05 12 (1 Min) 04.17.12

4/17/2012 Monthly Industrial Production (0315 HI time / 0915 EDT)
Forecast: 0.4%
Actual: 0.0%
Previous revision: none
DULL REACTION
Started @ 104.68
1st Peak @ 104.60 – 0316 (1 min)
8 ticks

Reverse to 104.81 – 0317 (2 min)
21 ticks

Notes: Report fell short of forecast, with no previous report revision. Oddly this caused little impetus to move short as the market was in rally mode before the report release. The initial spike would have filled you short with JOBB, then you would have minutes later.

CL 05 12 (1 Min) 03.16.12

 Industrial Production  Comments Off on CL 05 12 (1 Min) 03.16.12
Mar 162012
 


CL 05 12 (1 Min) 03.16.12

3/16/2012 Monthly Industrial Production (0315 HI time / 0915 EDT)
Forecast: 0.4%
Actual:0.0%
Previous revision:+0.4% to 0.4%
Spike / RETRACE
Started @ 106.36
1st Peak @ 106.18 – 0317 (2 min)
18 ticks
2nd Peak @ 106.17 – 0320 (5 min)
19 ticks

Reverse to 106.38 – 0327 (12 min)
21 ticks (2x top)

Notes: Report fell short of forecast, but previous report was revised upward by the same margin. These offset, but the current report negativity drove the small reaction. The initial spike fell to almost hit the 50 SMA, then after retracing just touched it on the 2nd peak. The reversal recovered the loss 7 minutes later.

CL 03 12 (1 Min) 02.15.12

 Industrial Production  Comments Off on CL 03 12 (1 Min) 02.15.12
Feb 152012
 


CL 03 12 (1 Min) 02.15.12

2/15/2012 Monthly Industrial Production (0415 HI time / 0915 EST)
Forecast: 0.7%
Actual:0.0%
Previous revision:+0.6% to 1.0%
Spike / RETRACE
Started @ 101.76
1st Peak @ 101.67 – 0415 (1 min)
22 ticks

Retrace to 101.82 – 0420 (5 min)
15 ticks

Notes: Report fell well short of forecast, but previous report was revised largely upward. These offset, but the current report negativity drove the small reaction. With the SMAs in a FIST, the spikes were reined in to just a few ticks. If it had been all good news, the price could have spiked up and cleared the FIST.

CL 03 12 (1 Min) 01.18.12

 Industrial Production  Comments Off on CL 03 12 (1 Min) 01.18.12
Jan 182012
 


CL 03 12 (1 Min) 01.18.12

1/18/2012 Monthly Industrial Production (0415 HI time / 0915 EST)
Forecast: 0.5%
Actual:0.4%
Previous revision:-0.1% to 0.3%
Spike / RETRACE
Started @ 101.29
1st Peak @ 101.07 – 0416 (2 min)
22 ticks

Retrace to 101.33 – 0419/0420 (4/5 min)
26 ticks (2x top)

Notes: Report fell short of forecast, and previous report was revised downward. Small short reaction aided by downward fan. Price moved downward 1more waves after report, but this is after the short term reaction of the report.

CL 03 12 (1 Min) 12.15.11

 Industrial Production  Comments Off on CL 03 12 (1 Min) 12.15.11
Dec 152011
 


CL 03 12 (1 Min) 12.15.11

12/15/2011 Monthly Industrial Production (0415 HI time / 0915 EST)
Forecast: 0.3%
Actual:-0.2%
Previous revision: none
Spike with 2nd peak
Started @ 95.65
1st Peak @ 95.79 – 0416 (1 min)
14 ticks

2nd Peak @ 95.93 – 0421/0423 (6/8 min)
28 ticks (2x top)

Notes: Report fell short of forecast. Opposite reaction that expected probably due to downward fan before report. 2nd peak is just above 200 and 50 SMAs

CL 03 12 (1 Min) 11.16.11

 Industrial Production  Comments Off on CL 03 12 (1 Min) 11.16.11
Nov 162011
 


CL 03 12 (1 Min) 11.16.11

11/16/2011 Monthly Industrial Production (0415 HI time / 0915 EST)
Forecast: 0.4%
Actual:0.7%
Previous revision:-0.3% to -0.1%
Spike with 2nd peak
Started @ 101.02
1st Peak @ 101.17 – 0416 (1 min)
15 ticks

2nd Peak @ 101.24 – 0418 (3 min)
22 ticks

Notes: Report exceeded forecast, but previous report was revised downward. This caused the spike with the long tail on the first candle, but after the overall report was digested, the current positive report outweighed and caused the 2nd peak.

CL 03 12 (1 Min) 10.17.11

 Industrial Production  Comments Off on CL 03 12 (1 Min) 10.17.11
Oct 172011
 


CL 03 12 (1 Min) 10.17.11

10/17/2011 Monthly Industrial Production (0315 HI time / 0915 EDT)
Forecast: 0.2%
Actual: 0.2%
Previous revision:-0.2% to 0.0%
Spike / RETRACE
Started @ 87.41
1st Peak @ 87.23 – 0317 (2 min)
18 ticks

Retrace to 87.34 – 0318 (3 min)
11 ticks

Notes: Report matched forecast, but previous report was revised downward. Small short reaction aided by downward fan initiated at 0305 (10 min before report broke). Price moved downward 2 more waves after report, but this is after the short term reaction of the report.