6B 06-15 (1 Min) 4.2.2015

 GBP Construction PMI  Comments Off on 6B 06-15 (1 Min) 4.2.2015
Apr 072015
 

6B 06-15 (1 Min)  4_2_2015

4/2/2015 Monthly Construction PMI (0430 EDT)
Forecast: 59.7
Actual: 57.8
SPIKE / REVERSE
Started @ 1.4828
1st Peak @ 1.4807 – 0430:01 (1 min)
21 ticks

Reversal to 1.4829 – 0432 (2 min)
22 ticks

Notes: Report came in weaker than the forecast with 1.9 pts offset. This caused a quick short spike of 11 ticks that started on the R1 Mid Pivot and fell to reach the PP Pivot and extend the LOD in 1 sec. With JOBB and a 4 tick bracket, you would have filled short at 1.4819 with 5 ticks of slippage, then seen it settle and hover around 1.4812 for 5 sec to allow 7 ticks to be captured. After that it reversed 22 ticks in the next min back to the R1 Mid Pivot.

6B 06-15 (1 Min) 5.5.2015

 GBP Construction PMI  Comments Off on 6B 06-15 (1 Min) 5.5.2015
May 072015
 

6B 06-15 (1 Min)  5_5_2015

5/5/2015 Monthly Construction PMI (0430 EDT)
Forecast: 57.6
Actual: 54.2
SPIKE / REVERSE
Started @ 1.5122
1st Peak @ 1.5080 – 0430:01 (1 min)
42 ticks

Reversal to 1.5129 – 0451 (21 min)
49 ticks

Notes: Report came in weaker than the forecast with a large 3.4 pts offset. This caused a quick short spike of 42 ticks that started on the 100/200 SMAs and OOD then fell to nearly reach the S1 Pivot and extend the LOD in 1 sec. With JOBB and a 4 tick bracket, you would have filled short at 1.5112 with 6 ticks of slippage, then seen it peak and retrace quickly to hover around the S1 Mid Pivot. In this case, due to the large offset and reversal likely due to “too much too fast”, stay in and wait for it to drop again later in the bar. This would have allowed an exit with about 25 ticks as it hovered at 1.5087 as the bar expired. Then it reversed 49 ticks in the next 20 min to the Major SMAs and the PP Pivot.

6B 06-15 (1 Min) 6.2.2015

 GBP Construction PMI  Comments Off on 6B 06-15 (1 Min) 6.2.2015
Jun 062015
 

6B 06-15 (1 Min)  6_2_2015

6/2/2015 Monthly Construction PMI (0430 EDT)
Forecast: 55.1
Actual: 55.9
SPIKE WITH 2ND PEAK
Started @ 1.5204
1st Peak @ 1.5224 – 0430:00 (1 min)
20 ticks

Reversal to 1.5215 – 0432 (2 min)
9 ticks

Final Peak @ 1.5246 – 0447 (17 min)
42 ticks

Reversal to 1.5228 – 0514 (44 min)
18 ticks

Notes: Report came in stronger than the forecast with 0.8 pts offset. This caused a quick long spike of 20 ticks that started in between the 50 SMA and OOD /100 SMA then rose to cross the 100/200 SMAs / PP Pivot to nearly reach the LOD. With JOBB and a 4 tick bracket, you would have filled long at 1.5210 with 2 ticks of slippage, then seen it peak and retrace quickly to hover around 4-5 ticks of profit. This would have been the safe exit. It reversed 9 ticks in the next min before stepping higher for a final peak of 22 more ticks in 15 min after crossing the R1 Mid Pivot. Then it reversed 18 ticks in 27 min to the 50 SMA.

6B 09-15 (1 Min) 7.2.2015

 GBP Construction PMI  Comments Off on 6B 09-15 (1 Min) 7.2.2015
Aug 012015
 

6B 09-15 (1 Min)  7_2_2015

7/2/2015 Monthly Construction PMI (0430 EDT)
Forecast: 56.6
Actual: 58.1
SPIKE WITH 2ND PEAK
Started @ 1.5582
1st Peak @ 1.5602 – 0430:03 (1 min)
20 ticks

Reversal to 1.5595 – 0430:16 (1 min)
7 ticks

2nd Peak @ 1.5610 – 0434 (4 min)
28 ticks

Reversal to 1.5592 – 0451 (21 min)
18 ticks

Pullback to 1.5609 – 0533 (63 min)
17 ticks

Notes: Report came in stronger than the forecast with 1.5 pts offset. This caused a quick long spike of 20 ticks that started on the 50 SMA then rose to cross the 100 and 200 SMAs but fall just short of the PP Pivot. With JOBB and a 4 tick bracket, you would have filled long at 1.5589 with 3 ticks of slippage, then seen it peak after 3 sec. It reversed 7 ticks quickly before climbing for a 2nd peak of 8 more ticks in 3 min to the PP Pivot / OOD. This would have allowed an exit between 10 and 20 ticks. After that it reversed 18 ticks in 17 min to the 200 SMA before pulling back 17 ticks in 42 min.

6B 09-15 (1 Min) 8.4.2015

 GBP Construction PMI  Comments Off on 6B 09-15 (1 Min) 8.4.2015
Sep 072015
 

6B 09-15 (1 Min) 8_4_2015

8/4/2015 Monthly Construction PMI (0430 EDT)
Forecast: 58.6
Actual: 57.1
INDECISIVE (TRIPWIRE TO CANCEL)
Started @ 1.5569
Whipsaw between 1.5565 – 1.5584 – 0431 (1 min)
19 tick span

Notes: Report came in weaker than the forecast with 1.5 pts offset. We saw a large premature short move of about 20 ticks starting 11 sec before the scheduled release time. This is a clear case to cancel the order as precursor for chaos. Cancel the order, or you would have seen a losing scenario as the whipsaw panned out on the :31 bar.

6B 09-15 (1 Min) 9.2.2015

 GBP Construction PMI  Comments Off on 6B 09-15 (1 Min) 9.2.2015
Sep 072015
 

6B 09-15 (1 Min) 9_2_2015

9/2/2015 Monthly Construction PMI (0430 EDT)
Forecast: 57.6
Actual: 57.3
SPIKE WITH 2ND PEAK
Started @ 1.5300
1st Peak @ 1.5292 – 0430:25 (1 min)
8 ticks

2nd Peak @ 1.5282 – 0437 (7 min)
18 ticks

Reversal to 1.5301 – 0454 (24 min)
18 ticks

Notes: Report came in modestly weaker than the forecast with 0.3 pts offset. This caused a short spike of 8 ticks in 25 sec that started on the 200 SMA and fell to reach the 100 SMA. With JOBB and a 4 tick bracket, you would have filled short at 1.5296 with no slippage, then seen it trickle lower to the 100 SMA to allow about 3 ticks to be captured where it hovered. After a few min struggling with the 100 SMA, it fell for a 2nd peak of 10 more ticks in 6 min as it crossed the S1 Pivot. Then it reversed 19 ticks in 17 min to the OOD. After that it fell again, but unlikely due to the sentiment from this report.

6B 12-15 (1 Min) 10.2.2015

 GBP Construction PMI  Comments Off on 6B 12-15 (1 Min) 10.2.2015
Jan 052016
 

6B 12-15 (1 Min) 10_2_2015

10/2/2015 Monthly Construction PMI (0430 EDT)
Forecast: 57.5
Actual: 59.9
SPIKE / REVERSE
Started @ 1.5141
1st Peak @ 1.5169 – 0430:02 (1 min)
28 ticks

Reversal to 1.5152 – 0430:56 (1 min)
17 ticks

Pullback to 1.5162 – 0434 (4 min)
10 ticks

Reversal to 1.5148 – 0440 (10 min)
14 ticks

Expected Fill: 1.5149 (long)
Slippage: 4 ticks
Best Initial Exit: 1.5168 – 19 ticks
Recommended Profit Target placement: 1.5163 (above the R1 Pivot)

Notes: Quick and large spike due to the large offset. Profit target would have filled nicely, otherwise exit quickly with the hovering.

6B 12-15 (1 Min) 11.3.2015

 GBP Construction PMI  Comments Off on 6B 12-15 (1 Min) 11.3.2015
Jan 052016
 

6B 12-15 (1 Min) 11_3_2015

11/3/2015 Monthly Construction PMI (0430 EDT)
Forecast: 58.9
Actual: 58.8
DULL NO FILL
Started @ 1.5415
1st Peak @ 1.5420 – 0430:46 (1 min)
5 ticks

Reversal to 1.5398 – 0444 (14 min)
22 ticks

Pullback to 1.5162 – 0434 (4 min)
10 ticks

Reversal to 1.5148 – 0440 (10 min)
14 ticks

Expected Fill: 1.5149 (long)
Slippage: 4 ticks
Best Initial Exit: 1.5168 – 19 ticks
Recommended Profit Target placement: 1.5163 (above the R1 Pivot)

Notes: Quick and large spike due to the large offset. Profit target would have filled nicely, otherwise exit quickly with the hovering.

6B 12-15 (1 Min) 12.2.2015

 GBP Construction PMI  Comments Off on 6B 12-15 (1 Min) 12.2.2015
Jan 052016
 

6B 12-15 (1 Min) 12_2_2015

12/2/2015 Monthly Construction PMI (0430 EDT)
Forecast: 58.4
Actual: 55.3
SPIKE / REVERSE
Started @ 1.5063
1st Peak @ 1.5032 – 0430:02 (1 min)
31 ticks

Reversal to 1.5042 – 0434 (4 min)
10 ticks

Pullback to 1.5032 – 0436 (6 min)
10 ticks

Reversal to 1.5059 – 0528 (58 min)
27 ticks

Expected Fill: 1.5053 (short)
Slippage: 6 ticks
Best Initial Exit: 1.5033 – 20 ticks
Recommended Profit Target placement: 1.5038 (below the S1 Mid Pivot)

Notes: Quick and large spike due to the large offset. Profit target would have filled nicely, otherwise exit quickly with the hovering near the bottom.

6B 03-16 (1 Min) 1.5.2016

 GBP Construction PMI  Comments Off on 6B 03-16 (1 Min) 1.5.2016
Jan 082016
 

6B 03-16 (1 Min) 1_5_2016

1/5/2016 Monthly Construction PMI (0430 EST)
Forecast: 56.1
Actual: 57.8
DULL FILL
Started @ 1.4701
1st Peak @ 1.4716 – 0430:02 (1 min)
15 ticks

Reversal to 1.4693 – 0432 (2 min)
23 ticks

Continued Reversal to 1.4673 – 0501 (31 min)
43 ticks

Pullback to 1.4687 – 0502 (32 min)
14 ticks

Expected Fill: 1.4705 (long)
Slippage: 0 ticks
Best Initial Exit: 1.4707 – 2 ticks (likely exit 1.4704 – 1 tick loss)
Recommended Profit Target placement: 1.4715 (just above the PP Pivot)

Notes: Quick spike reversed after 3 sec due to the strong resistance of the 200 SMA and PP Pivot. Look to exit quickly near breakeven. It continued to reverse following the momentum of the downtrend.