4/2/2015 Monthly Construction PMI (0430 EDT)
Forecast: 59.7
Actual: 57.8
SPIKE / REVERSE
Started @ 1.4828
1st Peak @ 1.4807 – 0430:01 (1 min)
21 ticks
Reversal to 1.4829 – 0432 (2 min)
22 ticks
Notes: Report came in weaker than the forecast with 1.9 pts offset. This caused a quick short spike of 11 ticks that started on the R1 Mid Pivot and fell to reach the PP Pivot and extend the LOD in 1 sec. With JOBB and a 4 tick bracket, you would have filled short at 1.4819 with 5 ticks of slippage, then seen it settle and hover around 1.4812 for 5 sec to allow 7 ticks to be captured. After that it reversed 22 ticks in the next min back to the R1 Mid Pivot.